
Add to Cart
550kw Turgo Wheel Turbine For Micro Hydro Generator
overview
We can supply hydraulic turbines system , hydro turbine system such as kaplan turbine, propeller turbine, francis turbine and pelton turbine, turgo turbine and so on, also with speed governor, generator, valves, excitation system and its other accessories.
In order to guarantee the product quality,the company has advanced testing instruments and strictly defers to ISO9001 quality management system.It is strictly controlled the quality in every process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only high-quality components, and undergo rigid quality inspections to ensure high efficiency and reliable operation.
Deflector speed control giving a fast response to load / frequency changes
Modular design approach
Flexibility in turbine design, layout and configuration
No penstock surge in response to a change in load or frequency
No penstock surge on emergency shutdown on loss of grid
Operation possible down to 10% of rated flow
A higher annual energy may be possible than is available from reaction turbines
on projects with long periods of low flow
Specification
Name | 550kw Turgo Wheel Turbine |
Water Head | 103.0m |
Runner Diameters | 0.64 m |
Capacity2 | 550KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.